Well now that we have been in our house for close to 2 years now we have decided it's time to start finishing the basement. We have a lot of work to do though. I had some duct work that needed finishing before I could start working on the framing of walls. Now that duct work is done. I do have a some adjustments that need to be made to the HVC though. Hopefully I will be able to get at those things this next couple of weeks or so.
I'll be posting pictures as we start framing the basement. It will be a big project and a lot of work. It is tough to find the time to even get work done sometimes. I'll have to make sure I set some time each week.
Saturday, November 15, 2008
Subscribe to:
Posts (Atom)